Factory direct Sialkot, Pakistan. Shipping worldwide.
Who we are

A factory that says yes to a 60 piece order

Most export houses in Sialkot are built for container buyers. A brand ordering its first run either gets ignored or pays an agent to stand between them and the sewing floor. We removed that layer.
Established
2016Year we opened

2016

Factory established

42

Industrial machines

85+

People on the floor

40+

Brands in production
Our story

We started on the floor, not in an office

01

Eight machines and one rule

The founders ran lines for export houses that only quoted 500 pieces and up. The orders we kept turning away were the interesting ones. In 2016 we took a unit on Daska Road and started saying yes to them.
02

Branding moved in house

Subcontracting embroidery and printing was adding two weeks to every order. Bringing both departments inside cut the average lead time from 32 days to 21, and it is the reason small runs work here.
How we work

Four things we will not compromise on

Most sourcing problems are information that arrived too late. These four habits exist to stop that.

Price first

Before any deposit

A costed spec sheet with fabric, trims, decoration and freight broken out, so you can see what you are paying for.

Turnaround24 hours
FormatLine by line
Get a Quote
Most chosen

Approve first

Before we cut

A 3D digital sample, then a physical one. Nothing is cut in bulk until the sample you are holding is the garment you want.

Digital3D render
Physical1 free revision
See the process

Tell you early

Before the deadline

If a dye lot fails or a trim runs late you hear it that day with two options, not after your launch date has passed.

UpdatesEvery stage
PhotosFabric to packing
Get a Quote
Standards

Compliance your buyer will ask about

If you sell into a marketplace or a retailer, these are the checks they request. We prepare them with the shipment rather than after it.
AreaWhat we runDocumented
Fabric inspection4 point system before cuttingPer roll
Inline QCEvery 50 pieces against the gold sealPer line
Final inspectionAQL 2.5Written report per shipment
Social complianceNo child labour, paid overtime, safe floorThird party audits welcome
Export documentsInvoice, packing list, HS codes, originWith every shipment

Come and see the floor, or start with 50 pieces

Buyers visiting Sialkot are welcome any working day and the airport is 25 minutes away. If you are not travelling, we will walk the same departments on a video call.
Reply time
24 hrs

Costed spec sheet with fabric options, MOQ and a line by line price. No agent in between.

Subscribe to get manufacturing guides and fabric updates in your inbox.