Factory direct Sialkot, Pakistan. Shipping worldwide.
Capabilities

Eight departments, one building

Fabric, patterns, cutting, stitching, embroidery, printing, inspection and packing all sit under the same roof on Daska Road. That is what holds a 50 piece order to an 18 day lead time.
Factory floor
42Industrial machines

8

Departments in house

42

Machines on the floor

85+

People employed

0

Steps subcontracted
Departments

Nothing leaves the building for branding

Subcontracting decoration is what adds two weeks to a typical order. Keeping it inside is why a small run still moves quickly.
Flat, puff and chenille01

Embroidery

Flat, puff and chenille

Logos digitised in house, stitched on a test swatch first, then run flat, 3D puff or chenille depending on the finish you want.

ColoursUp to 15 per design
DigitisingFree with bulk
TypesFlat, puff, chenille

Get a Quote

Screen, puff and DTF02
Printing

Screen, puff and DTF

Water based and plastisol screen printing for volume, high density puff for streetwear, DTF when the run is too small for screens.

ScreensPriced across the run
DTFBest under 100 pcs
PuffHigh density
Get a Quote
All over panel printing03
Sublimation

All over panel printing

Panels printed then cut and sewn, which is the only way artwork carries across a seam without a break in the pattern.

CoverageFull garment
MOQ25 per design
Best forTeam kits
Get a Quote
Drafting and grading04
Pattern room

Drafting and grading

Blocks drafted from your measurements or a reference garment, graded across your size set and stored under your brand.

InputSketch or garment
OutputGraded size set
StorageUnder your name
Get a Quote
Sourcing and dyeing05
Fabric store

Sourcing and dyeing

Knit and woven sourcing from Faisalabad and Lahore mills, lab dips against your Pantone, garment dye, acid and enzyme wash.

Lab dips4 to 6 days
Dye lot300 kg minimum
WashesAcid, enzyme, pigment
Get a Quote
4 point and AQL 2.506
Quality control

4 point and AQL 2.5

Fabric graded before cutting, inline QC every 50 pieces against the gold seal, and a written final inspection report per shipment.

Fabric4 point system
InlineEvery 50 pieces
FinalAQL 2.5
Get a Quote
Numbers

Published minimums and lead times

Lead times start from an approved sample and a cleared deposit, and exclude shipping transit.
ServiceMinimumSample timeBulk lead timeBest for
Blank wholesale100 pieces4 working days12 to 15 daysResellers and decorators
Private label50 per style6 working days15 to 18 daysBrands launching fast
Cut and sew50 per design8 to 10 working days18 to 25 daysOwn fit and own fabric
Sublimated kits25 per design7 working days15 to 20 daysClubs and teams
Flat knitwear50 per design12 working days25 to 32 daysSweaters and cardigans
Repeat order50 per styleNot required12 to 15 daysRestocking a bestseller
Machinery

The equipment behind the finish

01

Lines set per fabric weight

Machine choice is what separates a clean hem from a wavy one. Fleece, jersey and stretch each run on lines set for that weight rather than on one general purpose floor.
02

Finishing and packing

Steam finishing, vacuum tables and a dedicated packing line. Poly bags, barcodes and retailer carton specs are handled before the goods leave the floor.

Send a sketch, a photo or a tech pack

All three are enough to start. The pattern room drafts the block, the 3D team renders it for approval, then we grade, cut and sew in house.
Reply time
24 hrs

Costed spec sheet with fabric options, MOQ and a line by line price. No agent in between.

Subscribe to get manufacturing guides and fabric updates in your inbox.